Completed On Time & To Budget

Cooling water loop installation

Hygienic & Environmental Engineering, as main contractor, designed, installed and commissioned one of the largest cooling water loops at a premier Biotech site in the UK.

The 800 metre, flow and return loop, consisted of a combination of 2.5,3,4,6,8 & 10 inch 316L Stainless Steel pipework taken over a light weight flat roof to avoid plant room congestion.

The system was commissioned to optimize & reduce WFI sub loop cooling times in order to support the ambitious site expansion plans.