HEES have carried out over the last 24 Months, multiple AHU Power and controls upgrades, for a Pharmaceutical manufacturing plants Process Area AHUs.
The work involved the installation of control panels, variable speed drives and instrumentation along with all power and controls cabling.
This work had to be carried out with close liaison with the end client and controls specialist, to enable work to be completed within both pre shutdown and shutdown program periods.